Post:Getting it all under Control
From Fusselman.org
Well, I've been busy this week, starting with some major work in the Datacenter on Thursday night. Richard was over to cut up some bar stools (they needed to be shorter) and I figured I'd have him help me carry a server. We ended up decommissioning the old UPS, and moving my existing 1500 downstairs, as well as actually installing the server i the rack. We then discovered that I had some sort of wiring weirdness (the newer APC complained), so we solved that. This week, I'll finish cleaning things up and take some pictures. I also did Over-Cabinet Lighting in the kitchen. It ended up looking really nice. 73 watts of CFL and about $20 total parts (including 6 CFL bulbs). Not too shabby.
On other fronts, just 48 days until Piday, and less than that till Becky and I's Anniversary. Also, the bike is almost functional. I've been working on getting a good rack of batteries together recently, and think I'm about there. This week, I'll hopefully finalize the batteries and get basic on-off control of the motor going.

